Previous Slide
Next Slide
DSMS front entrance

Dripping Springs Middle School Capital Improvements & Renovations

About the Project

The Dripping Springs Middle School capital improvements and renovation project will address several outdated components of the 39-year-old campus. The projects listed below will be completed during the summer months in 2024 and 2025.

Design & Construction Schedule

List of Projects

  • Ceilings (Acoustical ceiling system, grid/support)

  • Electrical and Lighting (Fixtures, controls, panels, switches, wire)

  • Paint

  • Flooring (Replace VCT with new resilient flooring)

  • Demolition of Existing Finish/System

  • Insulation (New energy-efficient insulation)

  • Restrooms (Fixtures, Partitions)

  • Replace Athletic Lockers

  • Replace Auxiliary Gym Bleachers

  • HVAC

  • Lift Station Monitoring System with Call Out

  • Remove and Replace Wall Tile in Bathrooms

  • Install P-lam Panels to all Interior Hallway Walls

  • Repair Foundation

  • Repair Drainage in Courtyard

Presentations

DSMS Renovation details